Rods push through a void and are joined as they go. A tape is pushed through a conduit and used to draw the cable back. The route decides which is needed.
In a void or cavity, where there is nothing to feed a tape along. Rods make the run up as they advance rather than following an existing route.
As long as sections are added. Rod kits are supplied as sections that join, at 1m and at 330mm for a kit that fits in a tool box.
No, its length is fixed, at 15m in a plastic case here. A run longer than the tape needs a longer tape rather than an extension to this one.
A stand holding several reels so multiple cores are drawn together without tangling, which is the other half of making a long run in one pull.
The 330mm rod cable access kit, which suits carrying to a job rather than being kept in a van with the longer 1m kit.
Rods push through a void and are joined as they go. A tape is pushed through a conduit and used to draw the cable back. The route decides which is needed.
In a void or cavity, where there is nothing to feed a tape along. Rods make the run up as they advance rather than following an existing route.
As long as sections are added. Rod kits are supplied as sections that join, at 1m and at 330mm for a kit that fits in a tool box.
No, its length is fixed, at 15m in a plastic case here. A run longer than the tape needs a longer tape rather than an extension to this one.
A stand holding several reels so multiple cores are drawn together without tangling, which is the other half of making a long run in one pull.
The 330mm rod cable access kit, which suits carrying to a job rather than being kept in a van with the longer 1m kit.
Get exclusive updates on offers & latest trends in construction industry
By sharing your email, you agree to our privacy policy & terms of service